SCL challenge under AYA (Tunnels and Tunnelling)

SCL challenge under AYA (Tunnels and Tunnelling)

Published an article written together with my colleagues on the very challenging AYA twin mined tunnels in Singapore, constructed by mining method (or SCL, Sprayed Concrete Lining) as part of the Circle Line stage 4.

Article available at:

https://www.tunnelsonline.info/features/region/asia/1

https://trid.trb.org/view/860130

AYA Mined (SCL) Tunnels, Singapore
AYA Mined (SCL) Tunnels, Singapore

← Browse all posts