[1] Da Via` , A., Marotta, M., & Peach, G. (2005). High pressure jet grouting in tunnels–a case study. In Y. Erdem, & T. Solak (Ed.), Underground Space Use. Analysis of the Past and Lessons for the Future, Proceeding of the 34th World Tunneling Congress. 1, pp. 477-483. Istanbul: A.A. Balkema Publishers.
[2] Yamamura, M., Da Via`, A., & Marotta, M. (2005). Overcome the Big Collapses by the Jet Grouting Technology at Taiwan High Speed Railway – Hukou Tunnel . International Symposium on Design, Construction and Operation of Long Tunnels. 1, pp. 487-483. Taipei: Chinese Taipei Tunnelling Association and Taiwan Area National Expressway Bureau.
[3] Da Via`, A., Marotta, M., & Peach, G. (2006). High pressure jet grouting for a collapsed tunnel—A case study. International Conference and Exhibition on Tunnelling and Trenchless Technology. 1, pp. 143-155. Subang, Malaysia: Institute of Civil Engineers Malaysia.
[4] Pearce, B. M., Koh, C. T., Tong, S. Y., & Marotta, M. (2008, April). SCL challenge under AYA . Tunnels and Tunnelling international , pp. 32-35.
[5] Ganeshan, V., Ow, C. N., Marotta, M., Yoshimitsu, A., & Jee, Y. Y. (2008). Grouting and its Application in Tunneling. International Conference on Deep Excavation, 1. Singapore.
[6] Tong, S. Y., Marotta, M., Joshi, M., Ow, C. N., Singhal, V., Stadelmann, R., (2008). Design and construction of twin mined tunnels in residual soil. International Conference on Deep Excavation, 1. Singapore.
[7] Tong, S. Y., Stadelmann, R., Mann, C. R., Tang, S. K., Marotta, M., Joshi, M., (2008). Design and construction of mined tunnels in challenging site conditions. In V. K. Kanjlia, T. Ramamurthy , P. P. Wahi, & A. C. Gupta (Ed.), Underground Facilities for Better Environment and Safety, Proceeding of the 37th World Tunnel Congress. 2, pp. 1220-1229. Agra: Central Board of Irrigation & Power.
[8] Marotta, M. (2010). Singapore Bukit Timah granite: Slurry quality control for TBM tunneling. World Transport Congress. 1, pp. 237-245. Singapore: Research Publishing.
[9] Pearce, B. M., Keong, P. C., Marotta, M., & Leong, L. C. (2011). Downtown Line 1, Contract 905 – Stacked Tunnelling under Formula 1. Proceeding of the 40th World Tunnel Congress. Helsinki.
[10] Marotta, M. (2013). Singapore's Land Transport Authority: 15 years of innovative use of sprayed concrete lining. Singapore International Transport Conference and Exhibition. Singapore: Land Transport Authority.
[11] Lim, J., Muthu Kumarasamy, D., Marotta, M. (2017) Latest development in Horizontal Grouting for Cross Passages in Thomson-East Coast Line C1-C2 . TUCSS Hulme Prize Competition paper
[12] Yee, T.C. Marotta, M, & Ow, C.N. (2018) Excavation Management System for Slurry TBM in Singapore . Proceeding of the World Tunnelling Congress 2018, Dubai
[13] Mohiadeen, M., Marotta, M. (2018) Construction of a 170m Long Cripple Sided Tunnel Using Variable Geometry Hydraulic Formwork in DTL 3, C927. Proceeding of Underground Singapore 2018. Singapore.
[14] Bernard, H., Lau, M.K., Senthilkumar, M., Sze, Y.S., Marotta, M., Senthilnath, G.T. (2018) Use of High Density Slurry for Shallow Tunneling in Thomson East Coast Line . Proceeding of Underground Singapore 2018. Singapore.
[15] Yee, T.C. Marotta, M, & Ow, C.N. (2018) Theory and Application of Excavation Management System for Slurry TBM in Singapore. Proceeding of Underground Singapore 2018. Singapore.
[16] Lim, S.Q., Chen, S.J., Marotta, M., Ho, K.S. (2018) T212 – Upper Thomson Station & Associated Tunnels (Undercrossing existing live CCL tunnels). Proceeding of Underground Singapore 2018. Singapore.
[17] Bernard, H., Lau, M.K., Senthilkumar, M., Sze, Y.S., Marotta, M., Senthilnath, G.T. Ow, C.N. (2019) High density slurry for shallow bored tunneling in Singapore. Proceeding of the World Tunnelling Congress 2019, Naples
[18] GM Gaspari, Marotta, M. (2022) "La resilienza nel mondo delle gallerie e la visione del sistema dei trasporti di Singapore. Gallerie e grandi opere sotterranee, Year XLIV, N. 142, June 2022
[19] Dawn Loh, Mohd Mohiadeen, Massimo Marotta, (2023) "Construction of 45m long cross passage in rock under the live CCL tunnel, in Thomson Line Contract 212" Underground Singapore 2023
[20] V. Sivalingam, L. Pakianathan, M. Marotta, D. Velu (2023)"Theoretical Basis and Practical Application of Excavation Management System for Tunnelling with EPB TBM" Underground Singapore 2023
Click my Google profile or Research Gate profile for full access to the publications and articles.