Hosted the TUCSS site visit to the AYA tunnels, been constructed as part of Singapore Circle Line Stage 4, contract C855. The site visit was held on 28 June 2008



Hosted the TUCSS site visit to the AYA tunnels, been constructed as part of Singapore Circle Line Stage 4, contract C855. The site visit was held on 28 June 2008


